Tuesday, June 30, 2009

Super Yacht hotel project delayed in London

The Super Yacht hotel due to open in London, is on hold owing to the economic crisis
Aquiva, the 170 meter long super yacht-hotel, is permanently anchored at London’s Docklands and is to be converted into a hotel. Featuring 158 rooms and suites, an on-board ballroom, a spa, gym, pool, and a celebrity chef restaurant and bar it is to be a contemporary luxury hotel.

Read more:
http://www.worldinteriordesignnetwork.com/news/super_yacht_hotel_project_delayed_in_london_090629

0 comments:

Post a Comment